Estimate copper plating current, time and amp-hour loading.
How to use the Copper Plating Time Calculator
Copper plating time estimates help review current density, plating area, target copper thickness and amp-hour loading. Production plating also depends on bath condition and throwing power.
Copper deposition estimate
Formula: Time (min) = target copper (um) / (0.329 x current density x efficiency)
Target copper: copper thickness to be deposited.
Current density: amperes per square decimeter.
Efficiency: plating current efficiency.
Formula Basis
Formula basis: Faraday's law of electrolysis adapted for copper deposition thickness.
Engineering note: bath efficiency, throwing power and hole-wall copper thickness must be validated by production measurement.
Example
At 2 A/dm2 and 90% efficiency, depositing 20 um copper takes about 33.8 minutes.
Inputs
Plating area
Current density
Target copper thickness
Current efficiency
Outputs
Estimated plating time
Total current
Amp-hour loading
Engineering Notes
Through-hole copper thickness may lag surface copper depending on throwing power.
Very high current density can create roughness, burning or poor distribution.
For production control, use real bath efficiency and measured copper thickness data.
Validation Checks
Current density window
Plating thickness
Amp-hour loading
Hole copper reliability
Related Manufacturing Process
Copper Plating - Current density, copper thickness, throwing power, plating area loading